ARTL provided crucial Geotechnical Consultancy and Laboratory Conformance Testing during the closure of upgrade of the Eunony Bridge, as part of the ongoing Wagga Wagga ‘Special Activation Precinct’. Pavement Designs, Bearing Capacity Assessments, Crane Pad Design and Concrete Testing were carried out by ARTL throughout the project duration.